It has been a long gestation process, but we have finally finished the majority of the design and lofting work for the Jester class proa. Attached is the Sailplan and Arrangements for the boat. We also have the construction drawings for the Hull, Ama and Beams completed. The foil and composite part drawings will be done soon.